Dugald River Non Process Infrastructure Electrical & Mechanical 

Project Budget: $2.3Million  |   Delivery Time: 14 Months   |   Man Hours Spent: 14,600  

Project Details: The Dugald River NPI electrical and mechanical project was the largest design and construct project undertaken at the time and as such had a number of challenges. The project involved the design, Installation and commissioning of all electrical system from the switchboards to the outlets, LED lighting, lightning protection, Network Cabling and the upgrade of site infrastructure. Given the harsh environment keeping the workforce cooling was a critical driver and the installation of Air conditioning systems in the Change house, The warehouse and the Metallurgical lab were key deliverables for the team. The communication and diligence shown by the design team, laid the foundation for the delivery of an outstanding project. The team work and culture displayed by the project team was instrumental in the successful delivery of this project.  The quality and professionalism shown by the project team has led to the awarding of two subsequent projects and is a credit to the project teams.