Dugald River Paste Plant Electrical & Instrumentation 

Project Budget: $900K  |   Delivery Time: 4 Months   |   Man hours Spent: 7,800 

Project Details: The Dugald River Paste plant electrical and Instrumentation project through Outotec was awarded on the back of the outstanding performance shown by the NPI team. The project included the installation and commissioning of all electrical systems throughout the Plant, Installation of all instrumentation devices and the installation of Network cabling, Lightning protection and LED lighting. The tight timeframe for the delivery of this project required a large flexible project team which created challenges for the project team. Clancy Corporations ability to quickly scale our project team was key driver for the successful delivery of this project.